SABIC invests in innovative chemistry and inaugurates state-of-the-art research centre in Geleen, The Netherlands

Sittard, Geleen, May 20, 2016 – On 19 May 2016 SABIC inaugurated a new research facility at the Brightlands Chemelot Campus in Geleen. The official opening was done by the Governor of the Limburg Province Theo Bovens and Peter Borman, Director Regional Technology Affairs Europe at SABIC. The inspiring state-of-the-art research centre supports an extension of SABIC’s research capabilities in the area of innovative chemistry and materials, supporting the company’s vision to become the world leader in the chemical industry.

Official opening

The 200 guests included Governor Theo Bovens representing the Dutch Province of Limburg, Mr. Sjraar Cox, Mayor of Sittard-Geleen, where SABIC is based, Bert Kip, CEO of Brightlands Chemelot Campus and Henny Jacobs, Director Investment Projects Netherlands, Foreign Investment Agency. With one push of the button, Governor Bovens and Peter Borman unveiled a work of art by Marcel Timmers, symbolizing engagement and expertise.
Continue reading

New projext in the fertilizer business awarded by Yara

  • EPC contract signed for a urea granulation plant in The Netherlands on a lump sum turn-key basis
  • Contract value is equal to approximately €125 MN

Milan, 29 July 2015 – Maire Tecnimont S.p.A. announces that itssubsidiary Tecnimont S.p.A. has been awarded by Yara International ASA (Yara) an EPC contract for a new urea granulation plant to be implemented in Sluiskil, The Netherlands.

Continue reading

Monaco lance les travaux de sa nouvelle extension sur la mer

EVENEMENT. La Principauté va continuer à s’agrandir : elle vient de lancer les travaux d’infrastructure maritime de sa future extension dite de l’anse du Portier. Un quartier posé sur un remblai, qui accueillera des logements et des équipements publics. Montant de la première tranche de travaux : 842 M€.

Coincée entre la montagne et la Méditerranée, la Principauté de Monaco recherche des mètres carrés. S’élevant dans les airs, les tours ne suffisent plus à répondre à la demande et le pays s’agrandit sur la mer. Aujourd’hui, 20 % de l’ensemble de son territoire (soit 40 hectares), ont été gagnés sur les flots grâce à des terre-pleins comme ceux du Sporting ou du quartier de Fontvieille, construits dans les années 1970. Poursuivant cette tradition, Monte-Carlo s’apprête à grappiller quelques hectares supplémentaires dans les années qui viennent, grâce aux travaux d’extension en mer de l’anse du Portier, lancés ce 31 août 2016.

Continue reading

Le gouvernement britannique donne son feu vert aux EPR d’Hinkley Point

EDF a finalement reçu l’approbation du gouvernement britannique pour la construction à Hinkley Point de deux réacteurs EPR. Pour Jean-Bernard Lévy, le pdg du groupe français, cette décision “marque la relance du nucléaire en Europe” et “la confiance portée à la technologie”.

L’énergéticien français vivait dans l’attente d’une décision britannique depuis le Brexit et la nomination d’un nouveau gouvernement. Et si Theresa May doit faire sortir son pays de l’Union européenne, elle n’a pas choisi de le faire sortir de l’atome : le gouvernement anglais a confirmé à EDF son accord pour la construction de deux réacteurs de nouvelle génération sur le site d’Hinkley Point, dans le Somerset (sud-ouest du pays).

Continue reading

CNIM’S INTERVENTION DOMAINS

For household and industrial waste treatment and biomass treatment, CNIM implements and offers waste-to-energy conversion, an essential component of a global multi-channel approach.

CNIM is active both in the production of new installations and in the renovation, extension, and regulatory compliance of existing waste and biomass treatment plants.

CNIM works in this field in various ways.

Continue reading

Mayor’s office approves £200m London energy plant

London’s mayor has given waste specialist company Viridor permission to build a £200m incinerator and waste recovery plant in south London.

The last remaining hurdle is now central Government approval before contractors Lagan and French specialist CNIM can start building the energy recovery facility at Beddington Lane in Sutton.

They will build two 106,500 tonne-a-year capacity mechanical biological treatment facilities, and one energy-from-waste plant with combined heat and power, also with a 106,500 tonne-a-year capacity.

The incinerator would burn waste from the boroughs of Croydon, Kingston upon Thames, Merton and Sutton, diverting about 95% of waste away from landfill.

Ian John, Head of Planning at Viridor, said: “The decision builds on the approval of the London Borough of Sutton and is another important step towards achieving planning permission and the delivery of next generation infrastructure for South London.

“Working in tandem with waste reduction, reuse, and enhanced recycling, Viridor’s Beddington ERF will play an important role in diverting waste from landfill, recovering renewable energy from what remains.

“Operating to the highest national and international standards, the facility will deliver real environmental, economic, social and community benefits.”

Sluiskil, Pays-Bas

L’usine Yara de Sluiskil est située sur le canal entre Gent et Terneuzen – une des principales voie fluviale au Bénélux qui relie la Mer du Nord à un important réseau de canaux.  Ce site industriel existe depuis 1929. C’est l’un des plus grands sites de production d’ammoniac  et d’engrais en Europe, et le plus grand site de production de l’AdBlue au monde.

Cette usine achemine de l’ammoniac, de l’acide nitrique, des nitrates, du CO2, de l’AdBlue® et des engrais NPK, partout en France. Ces produits sont livrés par voie ferroviaire, maritime et par camions vers la France. Cette usine est certifiée ISO 9001, ISO 14001, ISO 22000 et OHSAS 18001, méthode HACCP (production de CO2, ISO 22000).

Continue reading

Total Antwerp Refinery and Petrochemical Complex, Belgium

Total’s Antwerp complex is ocated in the port area of Antwerp, Belgium, and comprises a refinery, the Fina Antwerp Olefins plant and a polyethylene plant. It is the company’s largest refinery and petrochemical complex in Europe and the third biggest of its kind in Europe.

The complex produces a variety of petroleum products, including fuel oil, gasoline, LPG, chemicals, diesel and jet fuel, including ethylene, propylene, C4 fractions and aromatics such as benzene, toluene, xylene and styrene.

Continue reading

 Total Optara project at Total

The Total Optara project includes the construction of a new solvent asphalt extraction unit and a new mild hydrocracking unit in the Port of Antwerp. A large group of tec engineers is involved in the implementation of this project.

The Total Optara project is an extension/adjustment of an existing oil refinery. The refinery’s total licensed capacity is 20.5 million tonnes of crude oil per year.
The current installation uses thermal cracking to convert vacuum residue (VACRES) in the visbreaker unit (J 71) to lighter products (gas oil, cracked petrol and gas) and a less viscous residue. The new/adjusted installations provided by the OPTARA project convert the vacuum residue into high-quality oil components. These components are then processed further in the existing installations.tec has provided Total with highly qualified engineers with specific expertise in the oil and gas industry for many years and also contributes tec expertise to the Optara project.

Le Groupe SAGEC

Le Groupe SAGEC, 8 filiales, 70 collaborateurs spécialisés dans les différents secteurs de la promotion immobilière, recherche pour son agence de Douvaine (74) proche de Genève

RESPONSABLE DE PROGRAMME H/F
Douvaine (Genève)

Vous assurez la réalisation des opérations de logements, la coordination des travaux, la relation avec les bureaux d’étude et intervenants externes.
Vous participez à l’élaboration des projets, de la phase P.C jusqu’à la livraison des appartements en passant par la mise en place commerciale, le suivi financier, l’appel d’offres.
Vous avez la responsabilité du respect des objectifs qualitatifs et quantitatifs.

De formation supérieure, vous justifiez impérativement d’une expérience d’au moins 2 ans chez un promoteur à un poste similaire.

Type de contrat : CDI
Type d’emploi : Temps plein